Service 01 · Audit and analysis

Data for your energy management system: understand first, then decide.

The audit is the way into Fact & Feeling. For a limited period we measure in selected areas of your facility, link the readings to your existing data and floor plans and show you where indoor conditions affect patients’ wellbeing, where energy is used without benefit and where equipment behaves unusually. With minimal changes to your infrastructure and without a long-term commitment.

The recommended way in

How it runs

Step by step, from the first conversation.

Who it is for

  • Facilities that first want to see where they stand
  • Owners who need a solid basis for investment
  • Buildings with specific complaints, such as heat, noise or poor air
  1. 1

    First conversation

    You tell us which areas matter to you and what is on your mind. Together we agree the questions the audit should answer.

  2. 2

    Review documents and data

    We take over floor plans and usage plans and check which data already exists: meters, building management, existing sensors, exports.

  3. 3

    Measuring plan

    We decide which rooms to measure and which target values apply per room type – agreed with nursing, hygiene and technical staff.

  4. 4

    Installation

    The devices go into the selected rooms, plug-and-play. Little building work, minimal changes to building systems.

  5. 5

    Measuring phase

    The devices measure around the clock, on weekdays and weekends, day and night. The platform trains the models for each room as it goes.

  6. 6

    Analysis and report

    We analyse everything on several levels: indoor climate room by room, energy per area, operation of equipment. You get a report and a list of the most important measures.

  7. 7

    Closing conversation

    We go through the results with you and discuss which measures you can carry out yourself and where ongoing monitoring pays off.

What you get

  • A report per ward or area, with patient wellbeing first
  • Measures ordered by impact and effort
  • Unusual rooms, times and equipment marked on the floor plan
  • Access to the platform during the measuring phase

What we need from you

  • Floor plans or usage plans of the areas
  • If available: meter data or building management exports
  • A contact person from technical staff or management

And then

After the audit the devices can stay: the measuring phase becomes ongoing monitoring.

Request a project

FAQ

Frequently asked questions

Hospital energy audit: what does the Fact & Feeling audit include?

The Fact & Feeling audit is a measuring phase in selected areas: devices measure around the clock, readings are linked to meters, BMS data and floor plans, and you receive a report per ward or area with measures ranked by effect and effort. It shows where energy is used without benefit and whether room conditions stay in range. It is not a formal hospital energy audit under DIN EN 16247 or German law; those are carried out by qualified energy auditors, who can use the data.

Hospital energy efficiency: where should you start reducing consumption?

Start where energy is used without any room benefiting: plant schedules for offices, clinics and support areas, set points in corridors and stores, lighting in empty rooms. Patient rooms stay within the agreed range. To reduce hospital energy consumption safely, room data shows beforehand where the scope lies and afterwards whether conditions remained stable.

Hospital energy benchmarking: how do you compare sites fairly?

Hospital energy benchmarking only works when every data point is mapped to a room, an area and a site, and when each site uses the same indicators, periods and data quality. Indicators such as energy per bed or per square metre are orientation; differences between sites often have good reasons in their services. Fact & Feeling brings meters, BMS data and room data together so sites become comparable.

Energy management system for hospitals: what does it involve?

An energy management system for hospitals is organisation first, then technology: clear responsibility, a baseline per energy carrier, a metering concept, indicators and targets, measures assessed for cost-effectiveness, and checks of their effect. Meters and the BMS show how much and whether plant runs; room data shows whether conditions in patient rooms stay in the agreed range. Fact & Feeling is not a management system itself but supplies data for one.

ISO 50001 certification for hospitals: is it mandatory in Germany?

Not as such. Above 7.5 GWh a year, a hospital company needs an energy management system meeting ISO 50001 or an environmental management system under EMAS; below that it is voluntary under the EnEfG (as of October 2026, not legal advice). For an ISO 50001 hospital project, certification comes from an accredited certification body. Check your own case with legal counsel or the BAFA guidance.

What is the German Energy Efficiency Act and does it apply to hospitals?

The German Energy Efficiency Act (Energieeffizienzgesetz, EnEfG) sets duties for companies and public bodies based on their energy consumption, not their sector. Hospital operators, including non-profit ones, count as companies; public-law hospitals of the federal government or the states may fall under the rules for public bodies instead (as of October 2026, not legal advice). Which rules apply to your operator is a legal question.

EnEfG energy management system: which hospitals need one?

An EnEfG energy management system to ISO 50001, or an environmental management system under EMAS, is required for companies averaging more than 7.5 GWh of final energy a year over the last three calendar years. Above 2.5 GWh they must also draw up and publish implementation plans for cost-effective measures and meet waste heat duties (as of October 2026, not legal advice). The consumption of the whole operating company counts, not one building.

EnEfG amendment 2026: what would change for hospitals?

The government bill for the EnEfG amendment (2026) would raise the EnEfG threshold for a management system from 7.5 to 23.6 GWh, apply implementation plans between 2.77 and 23.6 GWh and drop waste heat reporting for most companies. As of mid-October 2026 the bill has not been adopted, so the current law applies (as of October 2026, not legal advice). Hospitals without a system should clarify their position with legal counsel rather than wait.

EED Article 11: what does the EU require?

EED Article 11 of Directive (EU) 2023/1791 requires a certified energy management system for companies averaging more than 85 TJ a year (about 23.6 GWh) by 11 October 2027. Germany's current EnEfG is stricter, with thresholds of 7.5 and 2.5 GWh (as of October 2026, not legal advice). National law decides what applies to a specific hospital operator.

Energy Efficiency Directive energy audit obligation: when does it apply?

The Energy Efficiency Directive energy audit obligation applies to companies above 10 TJ a year (about 2.8 GWh) without an energy management system: the first by 11 October 2026, then at least every four years, with an action plan (as of October 2026, not legal advice). A management system exempts a company from the audit duty. Formal audits are carried out by qualified energy auditors; Fact & Feeling room and meter data can support them.