Demand controlled ventilation: automatic where it fits. A recommendation where you decide.

With automation, the platform acts on what it finds: where ventilation, heating, lighting or sun shading are connected, the AI adjusts them live. Where you do not want automatic control or there are no smart systems, your team gets concrete recommendations. Many facilities start with recommendations and automate step by step.

How it runs

Step by step, from the first conversation.

Who it is for

  • Facilities with building management or controllable equipment
  • Buildings that want to test recommendations first and automate later
  • Areas with high energy use around the clock
  1. 1

    Check equipment

    We look at what equipment exists and what can be connected.

  2. 2

    Set limits

    You decide what the AI may control, in which rooms and within which values. Sensitive areas stay with recommendations.

  3. 3

    Start with recommendations

    At first the AI only suggests. Your team sees what it would do and can check it.

  4. 4

    Automate step by step

    Area by area, what has proven itself is released.

  5. 5

    Measure the effect

    Every adjustment is measured and flows back into training, so control becomes more precise over time.

What you get

  • Live control of connected equipment
  • Concrete recommendations where nothing is controlled
  • Full control over limits and releases
  • Evidence of the effect per room

What we need from you

  • Access to building management or controllable devices, where available
  • A contact person from technical staff
  • Your hygiene and safety requirements

And then

Where data from other systems is missing, data integration comes next.

Request a project

FAQ

Frequently asked questions

Building management system in a hospital: what does it need to do?

A hospital building automation system runs time schedules, setback modes and control loops for ventilation, heating and cooling. Under the EPBD it must also monitor and analyse energy use, detect efficiency losses, inform the responsible person and, from 29 May 2026, monitor indoor environmental quality. Fact & Feeling builds on your existing system: where equipment is connected, the AI adjusts it within limits you set; elsewhere your team gets recommendations.

BACS requirements hospitals must meet: what are they?

Under Article 13 of the EPBD, building automation and control systems (BACS) must be capable of continuously monitoring, logging, analysing and adjusting energy use; benchmarking and detecting efficiency losses; communicating and being interoperable across manufacturers; and monitoring indoor environmental quality. The BACS requirements hospitals face apply to them as non-residential buildings above 70 kW, where technically and economically feasible (as of October 2026, not legal advice).

EPBD building automation 70 kW: what does the rule say?

Under the EPBD building automation 70 kW rule, non-residential buildings whose heating, air-conditioning or combined ventilation systems exceed 70 kW effective rated output must have building automation and control systems by 31 December 2029, where technically and economically feasible. Buildings above 290 kW had an earlier deadline of 31 December 2024. The threshold refers to installed rated output, not annual consumption; your estates team or design engineers can confirm the figure (as of October 2026, not legal advice).

Building automation deadline 2029: what has to be in place?

By 31 December 2029, non-residential buildings above 70 kW need building automation and control, and automatic lighting controls that are suitably zoned and capable of occupancy detection. Planning, tendering, installation and commissioning take time in a hospital that cannot close, and every building above 70 kW faces the same deadline, so specialist contractors will be busy. Starting early with a survey of existing systems helps meet the building automation deadline 2029 (as of October 2026, not legal advice).

Building automation laws Germany: which rules apply to hospitals?

Among building automation laws, Germany's central rule is section 56 of the Building Modernisation Act (GModG): non-residential buildings with systems above 70 kW need building automation by the end of 2029, unless technically not possible or economically unreasonable. Hospitals and clinics are non-residential; care homes count as residential and are not covered. Separately, companies using more than 7.5 GWh of final energy a year on average need an energy or environmental management system under the Energy Efficiency Act (as of October 2026, not legal advice).

German Building Modernisation Act: what changed for hospitals?

Since 29 July 2026, the former Buildings Energy Act (GEG) has been called the German Building Modernisation Act (Gebäudemodernisierungsgesetz, GModG). For hospitals, the main change is that the building automation duty now applies from 70 kW instead of 290 kW, and the system must also monitor indoor climate quality. Check the current legal position with your legal team, as further guidance is possible (as of October 2026, not legal advice).

What is GModG section 56?

GModG section 56 is Germany's implementation of the EPBD automation rule. It requires non-residential buildings with heating, air-conditioning or combined ventilation systems above 70 kW to be equipped with building automation and control by 31 December 2029, unless technically not possible or economically unreasonable. It also sets minimum automation levels for new buildings and a transition rule for systems installed shortly before 2027 (as of October 2026, not legal advice).

GModG building automation: which functions are required?

Section 56(2) lists continuous monitoring, logging, analysis and adjustment of energy use; data access through a common, freely configurable interface; efficiency reference values; detection of efficiency losses; informing the operator about improvements; and monitoring of indoor climate quality. The last point needs readings from the rooms themselves. Fact & Feeling provides that room data, but does not confirm that a building meets the GModG building automation duty (as of October 2026, not legal advice).

GEG 71a building automation: what happened to the old rule?

Section 71a of the former Buildings Energy Act contained Germany's earlier building automation duty for non-residential buildings above 290 kW. Since the reform, the duty sits in section 56 GModG and applies from 70 kW, which widens the scope considerably. A hospital that fell below the GEG 71a building automation threshold should check its rated outputs again (as of October 2026, not legal advice).

Hospital BMS upgrade: where do you start?

Start by classifying which buildings and systems exceed 70 kW, then take stock of the existing BMS, meters, sensors and interfaces, and assess which required capabilities are missing, especially open interfaces and indoor environmental quality monitoring. No general cost figure can be given for a hospital BMS upgrade; it depends on what is already in place. A measuring phase with Fact & Feeling shows where room data is missing and which plant behaves unusually.

Hospital HVAC energy use: where does it go?

Air handling units move, filter, heat, cool and sometimes humidify large air volumes in every hour they run. NHS England's bulletin NETB 2026/1 describes the operating theatre as three to six times more energy-intensive than other parts of the hospital, with HVAC making up around 90 per cent of theatre energy. Much hospital HVAC energy use comes from plant running at full output in empty rooms.

Energy savings in operating theatres: how large can they be?

Drawing on modelling data, NETB 2026/1 states that between 132 and 286 MWh of energy could be saved per operating theatre each year through out-of-hours control. Its example table gives 357 MWh a year for a conventional theatre at full power and 225 MWh with evening setback. These are modelled NHS figures, not a forecast for your site; actual energy savings in operating theatres depend on plant, schedules and the conditions your ventilation safety group sets.

Operating theatre ventilation setback: who decides?

In England, NETB 2026/1 treats setback as a governed project overseen by the Ventilation Safety Group, with infection prevention, theatres, estates and the Authorised Person (Ventilation). In Germany, the DGKH guideline describes conditions for switching off theatre ventilation under DIN 1946-4, such as restart in time and flush-out periods. Fact & Feeling supports operating theatre ventilation setback projects with room data during off periods and session-time evidence; the decision stays with your hygiene and safety teams.

Laminar flow theatre energy efficiency: what needs extra care?

Laminar flow (UCV) theatres move very large air volumes and are the most energy-intensive theatres. NETB 2026/1 advises interlinking canopy fans with the air handling unit so they switch on and off together. For German room class Ia, additional time is needed after restart until a defined protected zone exists again. Room data such as temperature and humidity during off periods helps check laminar flow theatre energy efficiency measures.

Demand controlled ventilation: hospitals – which rooms are suitable?

Demand controlled ventilation adjusts airflow to a signal from the room, often CO₂. For demand controlled ventilation, hospitals should pick rooms with high and varying occupancy: outpatient waiting areas, education rooms, therapy gyms and day rooms. In theatres, critical care and isolation rooms, CO₂ is not a control signal; air change rates and pressure regimes follow the relevant standard. Fact & Feeling measures CO₂ per room and shows when spaces are actually used.

Room-by-room heating control: what does it bring?

Room-by-room heating control lets each room follow its own use and set point instead of one schedule for a whole building. Results depend on the whole package: thermostatic valves work best together with hydraulic balancing. In patient rooms, automatic control should leave room for individual needs rather than enforce one temperature. Where heating is connected, Fact & Feeling can adjust it within limits you set, or give recommendations.